CMDL provided functional design services for the major refurbishment of this 75’ cable ferry. The project included lengthening and widening of the hull to increase the vehicle carrying capacity, as well as a complete replacement and upgrade of the cable drive system. CMDL completed a detailed conditional survey of the existing vessel at Norway House, MB.
Client: Manitoba Infrastructure and Transportation – Marine Branch
Dates: 2009 – 2011