15 AEQ CABLE FERRY

Capilano Maritime has completed the detailed design package, including a comprehensive technical specification, for a 15 AEQ, 27.6m cable ferry for the Province of Manitoba.

  Return to all projects

13.5M SHALLOW DRAFT RIVER TUG

Chris Mulder supervised the production of a detailed design package, including a comprehensive technical specification, for the construction of a small tugboat for Manitoba Hydro.

  Return to all projects

M/V DALLAS‐FAYE Refit Plan

Chris Mulder conducted a condition survey of Manitoba Hydro’s self‐propelled, trailerable work barge in order to assess the extent of work required to attain a further 25 years of service life from the vessel.

  Return to all projects

AURORA EXPLORER - Refit Support

Mark Mulligan acted as Project Manager for the complete engine room structural revision to re‐align main engines and gearboxes to incorporate a pod system.

  Return to all projects

ALFRED SETTEE SR - Functional Design Services

CMDL provided functional design services for the major refurbishment of this 75’ cable ferry.

  Return to all projects

Concept LNG Ferry

In collaboration with Rolls-Royce, CMDL has prepared a concept LNG ferry suitable to inshore Canadian waters.

  Return to all projects

Complete Design Package of 23-Car Ketchikan Airport Ferry

CMDL partnered with ASD to provide a design-build contract for the provision of a 23-car, 149-passenger, sheltered water ferry for the State of Alaska, for service to the Ketchikan Airport.

  Return to all projects

Upper Arrow Lake - Ferry Replacement

CMDL is acting as Owner’s Engineer for the BC Ministry of Transportation’s Upper Arrow Lake Replacement Ferry project.

  Return to all projects

Shaver Tug - MV Sommer - Contract Design Package

In 2010, CMDL produced the complete detailed design package for an 80‐foot Columbia Class ASD Ship‐Docking Tug for Shaver Transportation Company of Portland, Oregon.